top of page

ARCHITECUTURE PROJECT 

Role:

Assisted the primary architect from early conceptual stage stage of the project through design development and alterations.
My
Responsibilities included: 
  • Floor Layout Plans
  • Client Presentations
  • Building Materials Determination
  • Working drawings Development
  • Communicate with stakeholders i.e. 3D Visualizer, Vendors, Clients

Project:

Design the Floor Layout Plans and Interiors of an existing Building Structure in Gurgaon 


Commissioned By:

Honeywell India, Gurgaon

​

DESIGN PROCESS


This project was design by DSP design Associates, Gurgaon Office. The design process was heavily influenced by the Design Thinking methodology similar to UX. The architects first understood the requirement of the clients and then deep dived into understanding the needs of the user, i.e. the employees. This was followed by more research, comparative analysis, conceptual design, detailed drawings and mumerous iterations.
Frame 20 (1).png

LAYOUT PLAN: SECOND FLOOR

Frame 20 (1).png

LAYOUT PLAN: THIRD FLOOR

CAFETERIA- SPATIAL STUDY

WORK CAFE.jpg
bottom of page